Inspection and documentation
What arrives with your parts: inspection reports, material certificates and the traceability that connects them.
- CMM first-article reports
- EN 10204 certificates
- Batch traceability
- PPAP / EMPB on request
Documents we provide
-
Dimensional inspection report (CMM)
When: First article; series on request
Ballooned drawing, all characteristics
-
First article inspection report
When: First article
Customer format: AS9102, PPAP or VDA 2 / EMPB
-
PPAP submission
When: On request
Level per customer requirement
-
Material certificate
When: Every batch
EN 10204 3.1 from the material supplier
-
Certificate of conformity (CoC)
When: Every delivery
Signed by quality department
-
Hardness and case-depth report
When: Heat-treated parts
Measured in-house after external treatment
-
Coating thickness report
When: Coated parts
Measured in-house after external treatment
-
Welding records
When: Welded parts
WPS / WPQR, welder certificates (ISO 9606 / AWS), weld inspection records (visual, dimensional)
Traceability
Each batch carries a number that links the delivered part to its material certificate, machine, program revision, operator and inspection results in our ERP. Parts are laser- or engraving-marked where the drawing allows (marking).
Machine data is collected automatically by SmartFactory MES and flows into Bizmo.ERP for batch traceability (digital factory).
Non-conformance handling
Deviations are contained, analysed and closed with an 8D report. If a part cannot be made to drawing, we ask before shipping — a concession request, never a surprise at your goods-inward inspection.
Customer audits
Customer and second-party audits are welcome. Our facilities are 220 km (about 2.5 hours) from Ankara and 165 km (about 2 hours) from Samsun (facilities).
Frequently asked questions
Which material certificates do you supply?
Inspection certificates according to EN 10204 3.1 from the material supplier, traceable to the batch. See the EN 10204 guide.
Do you support PPAP or VDA 2 (EMPB)?
Our IATF 16949 system supports production part approval. Submission level and format are agreed per customer.
Summary
- CMM inspection reports with ballooned drawings for first articles and series.
- Material certificates, CoC, hardness and coating reports with every delivery as required.
- Batch traceability through ERP and laser marking.
- 8D non-conformance handling; customer audits welcome.
Last updated:
Related pages
- Technical guides
First article inspection reports
AS9102, PPAP and VDA 2 compared; what to check in a report.
- Technical guides
EN 10204 material certificates
Types 2.1, 2.2, 3.1 and 3.2 — who issues them and what they prove.
Send us your drawing.
STEP, IGES, DXF or PDF. Quotation within 2–15 business days, depending on size and complexity.